project overview.
GOALS
- To save the top half of the door
- Have quick turnaround time because of cold weather conditions and energy loss within the facility
RESULTS
- Thankfully, this door was able to be repaired, rather than replaced, cutting back on the cost significantly. Custom metal was formed and sheeting was fabricated.
- Furthermore, the inside of the door was rubberized and undercoated to help prevent rusting and a new coat of green paint was added to the exterior.
Products and solutions used for this project
more of our work.
Related case studies
get in touch.
Let’s talk about your next project
Tell us about your project
Planning a commercial door, loading dock, or gate project? Share your requirements below and our team will be in touch within 24 hours.
Service & Support
Have a question or planning a project?
Our team is ready to help with overhead door, dock, and gate solutions.
