Wilcox International Door Corp.

project overview.

facility trailer doors

CHALLENGE

  • We were challenged to provide a solution that prevented the ingress of rain and snow into the loading dock making for unsafe slippery conditions
  • Protecting further damage to products from contamination & water damage
facility trailer doors

RESULTS

  • The rain shroud canopies were designed to fit over the existing dock seals which helped to speed up the installation process and resulted in a tighter seal for the openings. With our technicians working around the clock, the installation was complete in just over a week!
  • Considering it’s been quite the wet winter, there has been ample opportunity to gauge the effectiveness of the canopies.
Dock Seals correctly installed
Amazon Dock Seals Before
wilcox dock seal canopies

more of our work.

Related case studies

HD-DD-3065 springless rubber doors at a loading area
Fuel-bay and high-cycle terminal door upgrades for a national LTL carrier, plus 250+ work orders of ongoing service across 20+ states.
20210407 104023

The Problem A customer has a high-volume equipment repair facility, and it is pricey to upkeep the repairs on their overhead doors with another provider. Wilcox

get in touch.

Let’s talk about your next project

Tell us about your project

Planning a commercial door, loading dock, or gate project? Share your requirements below and our team will be in touch within 24 hours.

  • This field is for validation purposes and should be left unchanged.
Service & Support

Have a question or planning a project?
Our team is ready to help with overhead door, dock, and gate solutions.

Serving Canada and the U.S.
Call Us
Email