project overview.
The Problem
A manufacturing customer in the GTA required a custom solution for access to their equipment to easily provide maintenance on it. Each time they performed maintenance on the equipment (annually), they would have to remove a wall out and then re-secure it after. In addition the issues surrounding the wall was clearance space; the only spot where a door could be in installed was under a stairwell. Overall, this cost them a lot of money and huge amounts of downtime every time they maintained the equipment. They had reached out to several other vendors, but none were able to come up with a solution to their problem.
The Solution
Our Senior Technical Manager Tony Wong went to site to see if a custom solution would suit their needs. Tony recommended a custom door with special mounting requirements to accommodate to the existing wall construction. Wilcox supplied and installed a new door with custom mounting angles and reduced the height of the opening with a false header; if you see the images below, there are sectional door panels being used as a false header to close the opening.
Opening of the Door
Issues with Stairwell
Completed product with Rolling Steel and False Header
Products and solutions used for this project
more of our work.
Related case studies
get in touch.
Let’s talk about your next project
Tell us about your project
Planning a commercial door, loading dock, or gate project? Share your requirements below and our team will be in touch within 24 hours.
Service & Support
Have a question or planning a project?
Our team is ready to help with overhead door, dock, and gate solutions.